Pryluky tobacco processing plant of group of "British American Tobacco" continues to renovate with the participation of "STAB GROUP"

29 september, 2014

The next stage of the reconstruction of the tobacco processing plant of group of "British American Tobacco", located in Pryluky, Chernihiv region, was completed. This stage included the reconstruction of the old bituminous roof of production workshop by an area 10 000 m2, namely insulation and new waterproofing finish coverage. Successful experience of cooperation with "STAB GROUP" on the previous stages of reconstruction of factory in 2011 (then were reconstructed 15 000 m2 of roofs) became determining in choosing a supplier of products and solutions for roofing also this year.


It is important to note that the reconstruction of the roof, as before, was carried out using one of the most advanced waterproofing materials for today with confirmed reliability and durability - membranes based on thermoplastic polyolefins (TPO membrane). In addition to reliability and durability, an important advantage of the TPO membrane is its resistance to bitumen (not destroyed by contact with it), which is especially important in the reconstruction of old bituminous roofs.


For the reconstruction of the flat roof of the object thermal insulation of mineral wool, TPO membrane Fatrafol P-918 1.5 mm - 11 800 m2, as well as component parts was supplied by "STAB GROUP". Mounting for the project was performed by our partner - "Varmbud" company.

тпо мембрана реконструкція покрівлітпо мембрана реконструкція покрівлітпо мембрана реконструкція покрівлі